C.T.H. CE NORTH

STREAM DREDGING & CULVERT REPLACEMENT

Location

Kaukauna, Wisconsin

Key Services:

  • Surveying
  • Civil Engineering
  • Construction Services

M&E Approach:

  • Field survey the existing conditions & topography.
  • Conduct a wetland delineation of the swale corridors.
  • Model total flows entering each waterway.
  • Design a cross-section for post-dredging conditions to handle existing and future flows for the 100-year storm.
  • Notify adjacent properties of dredging activities.
  • Correspond with the WDNR regarding culvert replacement and design.
  • Submit an Individual Permit Application for Dredging Activities to WDNR.
  • Provide staking and feedback during construction.

Project Description:

  • City residents were noticing water backup within two swales north of CTH CE.
  • Dredging 0.6 miles of the swales was proposed to remove silt and vegetation impeding flow.